Official Gazette Number 35599, dated May 14, 2021, Agreement 260-2021, Approval of the Regulations for the Application of Decree No. 100-2020.
Congreso Nacional
- Decree: 170-2016
- Published: May 14, 2021
- Issuing body: Congreso Nacional
- Gazette: 35,599
- Category: Financial & Tax
Summary
This edition contains three important documents: an executive regulation to implement Decree 100-2020, a public tender from the Superior Court of Accounts to create an online sworn statement system, and a resolution extending the validity period of temporary debt consolidation and purchase measures for the tourism sector. These documents are of interest to businesses, public institutions, and tourism workers.
Considerations
Whereas Article 247 of the Constitution of the Republic establishes that the Secretaries of State are collaborators of the President of the Republic in the guidance, coordination, direction and supervision of the organs and entities of the National Public Administration, in the area of their competence.
Whereas in accordance with Article 351 of the Constitution of the Republic, the National Tax System shall be governed by the principles of legality, proportionality, generality and equity, in accordance with the economic capacity of the taxpayer.
Whereas in accordance with Article 9 of Legislative Decree No. 170-2016 containing the Tax Code published in the Official Gazette "La Gaceta" on December 28, 2016, it establishes that the President of the Republic, through the Secretariat of State in the Office of Finance (SEFIN), is authorized to issue administrative acts of a general nature called Regulations, within the scope of tax and customs policy competence and all those powers that by provision of the Constitution of the Republic and by Law correspond to it, by itself or through the aforementioned Secretariat of State.
Whereas in Articles 71 and 72 of Legislative Decree No. 170-2016 containing the Tax Code published in the Official Gazette "La Gaceta" on December 28, 2016, the duties of collaboration of public servants outside the Secretariat of State in the Office of Finance (SEFIN), Tax and Customs Superintendence (STA), Tax Administration and Customs Administration are regulated, as well as the duty to provide all kinds of data, reports or background information with tax or customs significance.
Whereas through Legislative Decree No. 181-2012 published in the Official Gazette "La Gaceta" on December 4, 2012, the Law for the Rationalization of Fuel Exemptions for Electricity Generation was approved, which among other provisions establishes the regulations for the collection of the Contribution for Social Programs and Road Patrimony Conservation (ACPV).
Whereas through Legislative Decree No. 404-2013 published in the Official Gazette "La Gaceta" the General Law of the Electrical Industry was approved, which has as its purpose the regulation of the activities of generation, transmission, distribution and commercialization of electricity in the national territory, the import and export of electrical energy and the operation of the national electrical system.
Whereas through Legislative Decree No. 100-2020 dated August 6, 2020, the National Congress approved an exemption from payment of the Contribution for Social Programs and Road Patrimony Conservation (ACPV), associated with fossil fuels used by electrical generation plants that are commercialized in the National Electricity Market, and likewise approved an exemption from the payment of Sales Tax on electricity transport, services required for quality maintenance as well as services provided by the National Electricity System Operator Association (ODS), in the exercise of system operation and administration of the Electricity Wholesale Market of the country, provided that such services do not generate profit for the ODS.
Whereas through Legislative Decree No. 100-2020 dated August 6, 2020, published in the Official Gazette "La Gaceta" on February 22, 2021, provisions are repealed regarding the guarantees for payment of the Contribution for Social Programs and Road Patrimony Conservation (ACPV).
Whereas in accordance with numeral 15 of Article 29 of the General Law of Public Administration, reformed through Legislative Decree No. 266-2013 dated December 16, 2013, it is the responsibility of the Secretariat of State in the Office of Finance to address all matters concerning the formulation, coordination, execution and evaluation of policies related to Public Finance, so that the correct application of legal norms related to the functioning of the National Tax System must be ensured.
Whereas in accordance with Article 60 of the Regulations for the Organization, Functioning and Competence of the Executive Branch contained in Executive Decree PCM-008-97 reformed by Decree PCM-35-2015 published in the Official Gazette "La Gaceta" on June 26, 2015, it is the responsibility of the Secretariat of State in the Office of Finance through the General Directorate of Tax Policy to define, follow up on and evaluate tax policy, in order to achieve a sustainable fiscal policy for the benefit of Honduran society.
Articles
PURPOSE: The present regulation has as its purpose to regulate the provisions contained in Legislative Decree No. 100-2020, published in the Official Gazette "La Gaceta" on February 22, 2021, Gazette No. 35524.
SCOPE OF APPLICATION: The rules contained in this regulation shall apply throughout the national territory to all companies in the electricity subsector that generate electricity with fossil fuels and that is commercialized in the National Electricity Market, as well as to the Association National Electricity System Operator (ODS) in the exercise of the operation of the National Electricity System and the administration of the wholesale market, to electricity companies that provide network services for the transport of electricity, and to companies operating isolated electrical systems, in accordance with the provisions of Legislative Decree No. 404-2013 containing the General Law of the Electrical Industry and its regulations and the Framework Treaty of the Central American Electricity Market.
DEFINITIONS: For purposes of the application of this regulation, the following concepts are defined: ACPV: Contribution for the Care of Social Programs and Conservation of Road Heritage, tax created by Decree No. 131-98, which is part of the "Import Parity Price System" formula, and is applied per gallon, a measure used in the United States of America or equivalent unit in the International System of Units (SI), for diesel, kerosene, bunker (fuel oil), LPG and AvJet imported or of national production. CUSTOMS: The administrative services responsible for the application of customs legislation and the collection of import and export duties and which are also in charge of the application of other laws and regulations relating to, among others, the importation, transit and export of goods. CUSTOMS ADMINISTRATION OF HONDURAS: A decentralized entity of the Presidency of the Republic, with functional, technical, administrative and national security autonomy, with its own legal status, responsible for the control, verification, inspection and collection of customs duties, with authority and competence at the national level and with domicile in the capital of the Republic. SELF-CONSUMPTION: Electrical energy produced and consumed by the same user through generation systems for its internal processes and which is not consumption for the operation of the generation system or the plant necessary for the production of electrical energy for commercialization purposes. This does not include the self-consumption of generation plants. CUSTOMS AUTHORITY: The official of the Customs Service who, by reason of his position and by virtue of competence granted, verifies the correct application of customs regulations, complies with them and ensures compliance. CONSUMPTION CERTIFICATE: Document that details the quantities of petroleum-derived fuels consumed in the plants of generating companies to produce electrical energy supplied to the National Interconnected System (SIN), in isolated electrical systems or micro-grids, and obtained through the control of fuel inventory. CREE: Electrical Energy Regulatory Commission, a Deconcentrated Body attached to the Presidency of the Republic, which shall act within the scope of its powers with functional and budgetary independence, with sufficient administrative powers for the fulfillment of its objectives as provided in Article 3 of Legislative Decree No. 404-2013 of the General Law of the Electrical Industry. CRIE: Regional Electrical Interconnection Commission, regulatory and normative entity of the Regional Electricity Market, with its own legal status, capacity of public international law, economic independence, functional independence and technical specialty, which shall perform its functions with impartiality and transparency; Article 19 of the Framework Treaty of the Central American Electricity Market. FUEL CONSUMPTION: Quantity of fuel given in a unit of volume, required by a plant or thermal generation unit to produce electricity. The unit of volume used for the calculation of the ACPV Tax is the American Gallon (US) or equivalent unit in the International System of Units (SI); one American Gallon is equivalent to 3.785 Liters. DECLARATION OF GOODS: The act carried out in the manner prescribed by the Customs Service, through which the interested party freely and voluntarily expresses the regime to which the goods are subject and accepts the obligations that it imposes. DECLARANT: The person who effects, or in whose name is effected, a DUCA. CUSTOMS WAREHOUSE OR CUSTOMS DEPOT: The regime through which goods are stored for a determined period, in a place prepared for such purpose, under customs authority with suspension of applicable duties. Goods in customs depot shall be under the custody, care and responsibility of the depositor. PRIVATE CUSTOMS WAREHOUSE: These are installations under fiscal surveillance, authorized by the superior authority of the customs service, which shall be used exclusively by the depositor and by those persons authorized by the Customs Service at the request of the depositor, with suspension of duties, to store vehicles, raw materials, agricultural machinery and/or explosives, in compliance with their productive activity or business line. PUBLIC CUSTOMS WAREHOUSE: These are installations under fiscal surveillance, authorized by the hierarchical superior authority of the Customs Service, which may be used by any person for the storage of goods, with suspension of duties. ELECTRICITY: The physical good underlying commercial transactions in any of its aspects: energy, capacity or complementary services, understanding that capacity is the rate of energy flow per unit of time, the capacity of an installation is the maximum power it can deliver, transport, or use, and complementary services are essential services to maintain supply quality that shall be identified in the Regulations. SURPLUS ELECTRICAL ENERGY: Surplus of capacity and energy that has been generated by generating companies with self-consumption schemes and that is injected for commercialization purposes into the National Interconnected System, this surplus energy is accounted for through a commercial measurement system in accordance with the regulatory provisions of the General Law of the Electrical Industry. EXEMPTION: The total or partial dispensation of payment of the tax or customs obligation approved by the National Congress, whose processing individually corresponds to the Executive Power, through the Ministry of State in the Ministry of Finance. NATIONAL ELECTRICITY MARKET: The set of purchase-sale transactions of electricity administered by the System Operator. REGIONAL ELECTRICITY MARKET: In consonance with the Framework Treaty of the Central American Electricity Market, it is the permanent activity of commercial transactions of electricity, derived from a dispatch of energy with regional economic criteria, through medium and long-term contracts between enabled agents. CUSTOMS OBLIGATION: It arises between the State and taxpayers at the moment the event that generates the duties occurs. COMPLEMENTARY SERVICES: Services required for the operation of the electrical system under conditions of quality, safety, reliability and lower economic cost, which shall be managed by the System Operator in accordance with the standards issued by CREE. WHOLESALE MARKET SYSTEM OPERATION SERVICES: All services in accordance with the powers granted to the System Operator entity, established in the General Law of the Electrical Industry and the standards issued by CREE. ELECTRICITY TRANSPORT SERVICES: Transmission service or distribution service provided as established in the General Law of the Electrical Industry and the standards issued by CREE. ISOLATED SYSTEMS: Those electrical systems that operate not connected to the National Interconnected System. REGIONAL ELECTRICAL SYSTEM: Central American Electrical System, composed of the electrical systems of the member countries of the Regional Electricity Market. NATIONAL INTERCONNECTED SYSTEM (SIN): The electrical system formed by the generating plants, the distribution networks and the national transmission network that physically unite them without interruption. SYSTEM OPERATOR (ODS): An entity of public, private or mixed capital, non-profit, in charge of the operation of the National Interconnected System (SIN) and its coordination with the Regional Electrical System and the administration of the National Electricity Market and its coordination with the Regional Electricity Market, with legal status granted by Resolution No. 1250-2016, dated November 9, 2016, issued by the Ministry of Human Rights, Justice, Governance and Decentralization (SDHJGD). UNIT OF MEASUREMENT: The United States gallon is established as the unit of measurement for the certification of consumption of petroleum-derived fuels as a universal measure or two hundred thirty-one (231) cubic inches, equivalent to three point seven hundred eighty-five (3.785) liters measured at the temperature of SIXTY DEGREES FAHRENHEIT (60 °F), equivalent to fifteen point six degrees Celsius or centigrade (15.6 °C). TITLE II OF THE EXEMPTION OF THE TAX CALLED CONTRIBUTION FOR THE CARE OF SOCIAL PROGRAMS AND CONSERVATION OF ROAD HERITAGE (ACPV)
EXEMPTION FOR ELECTRICITY SUBSECTOR COMPANIES: Companies in the electricity subsector are exempted from payment of the tax called Contribution for the Care of Social Programs and Conservation of Road Heritage (ACPV), on fossil fuels used exclusively for the generation of electricity that is commercialized in the National Electricity Market or in the Regional Electricity Market in accordance with the provisions of the General Law of the Electrical Industry and the standards issued by CREE, and with the Framework Treaty of the Central American Electricity Market. Likewise, companies in the electricity subsector are exempted from payment of the tax called Contribution for the Care of Social Programs and Conservation of Road Heritage (ACPV), on fossil fuel used exclusively for the generation of electricity in isolated electrical systems in compliance with the General Law of the Electrical Industry and the standards issued by CREE. In the case of purchases of fuel by electricity subsector companies from public customs depositors, they must follow the procedure established in this regulation.
THOSE NOT APPLICABLE TO THE EXEMPTION: The exemption detailed in the preceding article is not applicable to: 1. Those companies that do not meet the registration requirements contained in Article 2 of Legislative Decree No. 100-2020. 2. Fuels used for purposes other than the generation of electricity for commercialization. 3. Those contained in Article 1, second paragraph, of Legislative Decree No. 181-2012.
OF FUEL SURPLUSES: Fuel surpluses resulting from inventory control generated by electricity subsector companies that store fuel in customs warehouses must be nationalized by the depositor in accordance with the Customs Procedure for Fuel Inventory Adjustment in the Customs Informatic System.
OF NON-SIMULTANEITY: In accordance with the content of Article 17 of the Law of Fiscal Responsibility, contained in Decree No. 25-2016 published in the Official Gazette La Gaceta on May 4, 2016 and Article 33 of the Law of Efficiency of Public Income and Expenditure, contained in Decree No. 113-2011 published in the Official Gazette La Gaceta on July 8, 2011, any legal entity cannot enjoy more than one tax benefit protected by a Special Law that contains provisions of a tax nature; legal entities that are enjoying more than one tax benefit in relation to the exemption of ACPV, and prior to the date this Law comes into effect, must choose the tax benefit they wish to enjoy from that date, proceeding immediately to the registration in the corresponding Registry of Exempted Parties. Once the registration described above is completed, the Ministry of Finance (SEFIN) shall proceed to notify the institutions that grant, administer and verify the operations of the beneficiaries and the Tax Administration. Therefore, the exemption contained in Article 4 of this Regulation shall not apply to a company that is already enjoying a tax benefit for the exemption of ACPV.
TAX OBLIGATIONS: The exemption and tax or customs exemption under Legislative Decree 100-2020 does not exempt the obligated taxpayers from the duties of submitting declarations and other obligations contained in the Tax Code. TITLE III OF REGISTRATIONS AND SUPERVISION
OF REGISTRATION IN THE ELECTRICITY SUBSECTOR: Without prejudice to compliance with other special requirements necessary for their establishment, electricity subsector companies that use fossil fuels, in order to qualify for the exemption described in Article 1 of Decree No. 100-2020, must prove that they are duly registered in the Public Registry of Companies maintained by the Electrical Energy Regulatory Commission (CREE) as established in the General Law of the Electrical Industry contained in Legislative Decree No. 404-2013 and its regulations, otherwise present a certificate proving that they have such registration pending. Likewise, they must be duly registered in the Registries determined by the Ministry of State in the Ministry of Energy (SEN) created by Decree No. PCM 048-2017, through the General Directorate of Hydrocarbons and Biofuels created by Decree No. PCM-007-2020, otherwise present a certificate proving that they have such registration pending. There must also be registration in the Registry of Exempted Parties of the General Directorate of Control of Customs Franchises, dependent on the Ministry of Finance (SEFIN), in accordance with the provisions of Article 24 of Decree No. 278-2013 published in the Official Gazette La Gaceta on December 30, 2013 and Articles 21 and 58, numeral 2) of the Tax Code contained in Decree No. 170-2016 published in the Official Gazette La Gaceta on December 28, 2016.
OF CUSTOMS CONTROL AND SUPERVISION: The Customs Administration of Honduras, in accordance with the Tax Code, is responsible for inspecting and implementing customs control in the customs or fiscal warehouse. The control and rationalization of exemptions is the responsibility of the Ministry of State in the Ministry of Finance through the General Directorate of Control of Customs Franchises; in its inspection function of the use of exemptions subject to this regulation and the corresponding customs control, they may rely on reports issued by the System Operator in the fulfillment of its functions and in accordance with the powers granted by the General Law of the Electrical Industry and the standards issued by CREE. The Customs Administration of Honduras shall request, through the Tripartite Commission, a technical report for the control and verification of fuel consumption that is used exclusively for the generation of electricity by electricity subsector companies. In the event that the fuel was used for purposes other than those provided for in Legislative Decree No. 100-2020, the corresponding duties shall be paid. TITLE IV OF THE EXEMPTION FROM PAYMENT OF SALES TAX
OF THE EXEMPTION: In accordance with the content of Article 3 of Decree No. 100-2020, those services defined and contemplated in the Technical Tax Customs Instructive are exempt from the payment of Sales Tax, which includes the following:
- i)
Electricity Transport Services,
- ii)
Complementary Services; and,
- iii)
System Operation Services and Wholesale Market Administration Services in accordance with the national and regional regulatory framework of the electricity subsector. TITLE V OF THE PROCEDURE FOR VERIFICATION OF THE USE OF THE EXEMPTION
VERIFICATION PROCEDURE: Based on Articles 20, numeral 3, 21, numeral 13 and 72 of Decree No. 170-2016 containing the Tax Code, Tax Obligated Parties beneficiaries, covered by Decree No. 100-2020, are obligated to provide the following information: 1. Present to the General Directorate of Control of Customs Franchises (DGCFA) a report within the first five (5) days of the month following each of the purchase orders generated, paid and voided within the Honduras Exemptions Administrator Module Platform (PAMEH). 2. By the fifth (5) business day of each month, the company benefited with the exemption granted by Decree No. 100-2020 shall present to the General Directorate of Control of Customs Franchises a sworn declaration certifying the energy commercialized in the National Electricity Market in the immediately preceding month, the consumption of each type of fuel used in that same month to produce it, as well as the initial inventory, fuel purchases and the final inventory. 3. The General Directorate of Control of Customs Franchises shall verify that the fuel consumption and the final inventory reported in the sworn declaration presented by the exemption beneficiary agrees with the estimated corresponding data contained in reports prepared by competent technical entities. 4. The General Directorate of Control of Customs Franchises, with the accompaniment of the Tripartite Commission, may conduct verification inspections on the information provided in the sworn declaration. TITLE VI OF THE TRIPARTITE COMMISSION
ESTABLISHMENT: In accordance with the content of Article 5 of Decree No. 100-2020, a tripartite commission is established composed of representatives from:
- i)
the Ministry of State in the Ministry of Energy (SEN) (who presides over it),
- ii)
the Ministry of State in the Ministry of Finance (SEFIN); and,
- iii)
the Customs Administration of Honduras (CUSTOMS).
OBJECTIVE: The Tripartite Commission shall have as its purpose to prepare technical opinions and reports that have proposals for updating strategic plans, monitoring, verification, inspection and others that are required for the components subject to Decree No. 100-2020.
COMPOSITION OF THE COMMISSION: The Commission shall be composed of six (6) designated members, two (2) representatives from each institution (principal and alternate) from the Ministry of State in the Ministry of Energy (SEN), the Ministry of State in the Ministry of Finance (SEFIN) and the Customs Administration of Honduras (CUSTOMS), in the event that the principal cannot be present in the sessions, he or she must notify the Commission and shall be replaced by the alternate. The representatives in turn shall be supported by the technical and legal teams of each of the institutions that have designated them, when required.
CONVOCATIONS: Convocations to the sessions shall be made by the representative of the Secretariat of State in the Office of Energy (SEN), with (1) one week in advance.
OF THE SESSIONS: The Commission shall meet at least once a month, on the day and time to be established, preferably in the annual calendar approved in the last session of the preceding year. Sessions shall be held in the offices of the Secretariat of State in the Office of Energy (SEN) or in the place designated for such purpose by the Commission itself. Minutes of each session shall be drawn up by a representative; members of the Commission may request the incorporation of matters into the agenda in advance. Furthermore, the same order of the day shall include a point on miscellaneous matters. The agenda and related documentation must be sent by the secretary to the members of the Commission at least three (3) working days prior to the date of the meeting. The heads of each of the institutions must attend the sessions and have the right to speak and vote. Furthermore, technical and legal personnel from other institutions may attend as guests to contribute their technical knowledge to the formulation of the opinion or other document being prepared by the Commission. The Commission must keep a record of each session it holds, as well as each of the cases analyzed by it.
QUORUM: The Commission legally convoked may meet with the attendance of all its regular members in office, provided that the members representing the three institutions are present. The regular members have the right to one vote per institution represented; alternates have only the right to speak and not to vote; the vote of an alternate shall only be valid if duly authorized by the regular member. Any member of the Commission may request the president of the commission to suspend or adjourn the session due to lack of required quorum. In case the session cannot be held due to lack of quorum, the president of the commission or a regular member must call a new session to be held within the following forty-eight hours (48), which shall be held with those who attend, provided that there are present
regular or alternate members in office designated by two (2) of the representations that make up the Commission. When a regular member cannot attend a session, he must communicate this to his alternate three days in advance so that the latter may attend in the capacity of regular member representative, except in circumstances of force majeure and act of God.
VOTING: Each of the regular members or alternates in the capacity of regular member representative has the right to one vote and agreements must be reached by majority vote of its members present. The president of the commission must direct and moderate the debates during the sessions, seeking to provide fluidity to them.
OF THE SECRETARY: The representative of the Secretariat of State in the Office of Finance shall serve as secretary. During the sessions the president of the commission must be assisted in his work by the secretary of the Commission. The responsibilities of the secretary are: I. Verify the quorum and report it to the President of the Commission; II. Draw up the minutes of each of the sessions, which shall be signed by the secretary, the president, and the members present in the respective session; III. Read the minutes of the previous session; IV. Call the roll of the members of the Commission; V. Record the votes; VI. Circulate among the members of the Commission initiatives and reports that members must know; VII. Send a copy of the minutes to all members no later than five (5) working days after their approval; VIII. Report succinctly and in writing to the members of the Commission the concerns, suggestions, and observations made by the members of the Commission and account for them in an agenda item; IX. Such other matters as the Commission may assign to it.
OF THE ATTRIBUTIONS AND DUTIES OF THE COMMISSION: The tripartite Commission shall be responsible for: a. Preparing technical and advisory opinions on the different requests from electricity subsector generating companies, which shall serve to substantiate the resolution issued by the competent body. The Commission to issue its opinion has a maximum period of fifteen (15) working days counted from the date the request is received. b. Preparing reports containing proposals for updating strategic plans. c. Reviewing, monitoring, and controlling compliance with the norms that apply to the correct application of this regulation. d. Ensuring strict compliance with the norms applicable to this regulation. e. Recommending that inspections be carried out, whether on a punctual or general basis, to be conducted by the bodies according to the framework of their competencies. f. Determining violations and recommending the sanctions to be imposed by the competent body for infractions committed by the obligated taxpayers. g. Requesting information from other public or private institutions, in a formal manner for the development of its functions. h. Establishing the criteria to be followed for the evaluation of the different requests. i. Such other matters as may correspond. TITLE VII OF INFRACTIONS AND SANCTIONS
INFRACTION: An infraction is any action or omission that contravenes the legal order, provided that it is classified as such in some applicable norm.
VERIFICATION: The Secretariat of Finance (SEFIN) must verify and confirm that the obligated taxpayers benefited with exemptions comply with the commitments and objectives of Legislative Decree No. 100-2020.
SANCTION: Non-compliance with one or several commitments by the beneficiary of the exemption established in Decree No. 100-2020 shall result in the cancellation of the benefits granted, except in cases of force majeure or act of God duly proven, and must be sanctioned in accordance with the provisions of the Tax Code. The foregoing, without prejudice to the administrative, civil, or criminal liability that may be applicable. TITLE VIII GENERAL AND TRANSITORY PROVISIONS
5. - UPDATING OF THE REGULATION: The Secretariat of State in the Office of Finance in coordination with the Secretariat of State in the Office of Energy and the Honduran Customs Administration, in compliance with the corresponding legal framework, must make the changes, modifications, and/or updates of this Regulation that are necessary for its efficient application.
SUBMISSION OF REQUESTS AND RELATED PROCEDURES: During the application process of this regulation, for procedures related to the exemptions of Legislative Decree No. 100-2020, the submission of requests must be made in the form and conditions established by the General Directorate of Control of Customs Franchises of the Secretariat of Finance, in accordance with the applicable legal framework in force.
TRANSITION: In accordance with the provisions of Article 7 of Decree No. 100-2020 and in order to guarantee the correct dispatch of petroleum derivatives from the entry into force of Decree No. 100-2020 from its publication in the Official Gazette La Gaceta on February 22, 2021 until the date of publication of this Regulation in the Official Gazette La Gaceta, the Tripartite Commission is instructed to, within the framework of its attributions, request from the National Electrical Energy Company (ENEE) the technical support for the certification of fuel consumption intended for the generation of electrical energy that are recorded in the Honduran Customs System, with such certification having to comply with the necessary requirements to prove its validity and legality. The volumes of fuel that are being consumed and that have been documented with the customs computer system prior to the entry into force of this regulation shall have their consumption certification completed under this mechanism until they are completely consumed.
ADAPTATION OF SYSTEMS: In compliance with the provisions of Legislative Decree No. 100-2020, the Honduran Customs Administration shall make the necessary adaptations to the customs computer system to the new procedure established in this regulation.
EFFECTIVE DATE: This Regulation shall enter into force on the day of its publication in the Official Gazette "La Gaceta". BE COMMUNICATED AND PUBLISHED. CARLOS ALBERTO MADERO ERAZO Secretary of State in the Office of Coordination of General Government MARCO ANTONIO MIDENCE MILLA Secretary of State in the Office of Finance
Related laws
- Legislative Decree 185-2020 approving the Operation Contract for the Generation of Electric Power and Energy between the Secretariat of Natural Resources and Environment and the Commercial Company Hidroeléctrica Zompopero, S.A. de C.V. — Decree 185-2020 approves a contract between the Ministry of Natural Resources and Hidroeléctrica Zompopero company to generate electricity using water as fuel. This operation will produce 14,980 kilowatts of power, benefiting the national energy supply and requiring legislative approval because its effects extend beyond the current government's term. (Decree 185-2020, 2020)
- Decreto Ejecutivo No. PCM-059-2021 — Prórroga de las medidas de restricción a derechos fundamentales (Decree PCM-059-2021, 2021)
- Decreto Legislativo No. 165-2020 — Exoneración de ISV a Municipalidad de Nueva Arcadia para compra de excavadora (Decree 165-2020, 2021)
- Decreto Legislativo No. 30-2022 — Modificación del Presupuesto General de Ingresos y Egresos de la República - Ejercicio Fiscal 2022 (Decree 30-2022, 2022)
- Decreto Legislativo No. 30-2022 — Modificación del Presupuesto General de Ingresos y Egresos de la República y sus Disposiciones Generales, Ejercicio Fiscal 2022 (Decree 30-2022, 2022)