La oferta Económica de el Contratista y la Lista de Precios, aprobada de acuerdo con siguiente: No ACTIVIDAD OBRA CONTRATADA SEGÚN OFERTA ORIGINAL MODIFICACIÓN NO. 1 UNIDA D CANTIDA D P.U (L.) TOTAL (L.) CANTIDA D TOTAL (L.) 1.00 PRELIMINARES 1.01 MOVILIZACIÓN GLOBA L 1.00 15,755,514. 15,755,514.93 1.00 15,755,514.93 1.02 INSTALACIONES PROVISIONALES GLOBA L 1.00 2,248,995.1 2,248,995.16 1.00 2,248,995.16 1.03 TOPOGRAFÍA GLOBA L 1.00 4,042,758.9 4,042,758.97 1.00 4,042,758.97 1.04 DEMOLICIÓN Y RECONSTRUCCIÓN DE CERCO DE MAMPOSTERÍA, LOCALIZADO DENTRO DE LA CALZADA DE LA CALLE DE ACCESO M 16.55 10,023.22 165,884.29 16.55 165,884.29 1.05 DESMONTAJE Y MONTAJE DE LA GALERA LOCALIZADA DENTRO DE LA CALZADA DE LA CALLE DE ACCESO GLOBA L 1.00 428,424.83 428,424.83 1.00 428,424.83 1.06 CORTE DE ARBOLES Y LIMPIEZA GLOBA L 1.00 45,801.59 45,801.59 1.00 45,801.59 1.07 DRAGADO LECHO MARINO, COTA -14.00 M M3 18,605.27 737.08 13,713,572.41 18,605.27 13,713,572.41 Total PRELIMINARES 36,400,952.18 36,400,952.18 2.00 DOLPHIN'S DE ATRAQUE 2A PILOTES 2A.0 FABRICACIÓN DE PILOTE DE CONCRETO REFORZADO DE 50CMX50CM L=46.50M M 16,042.50 6,640.83 106,535,515.28 0 0 2A.0 HINCADO EFECTIVO DE PILOTES (30.00 M.) M 10,350.00 4,234.76 43,829,766.00 10,350.00 43,829,766.00 2A.0 DESCABEZADO DE PILOTES UNIDA D 345.00 5,551.34 1,915,212.30 345.00 1,915,212.30 -39- 2A.0 PRUEBA DE CARGA DINÁMICAS UNIDA D 3.00 146,008.61 438,025.83 3.00 438,025.83 Total PILOTES 152,718,519.41 46,183,004.13 2B CONCRETO 2B.0 CONCRETO EN MACIZO O CABEZAL CON RESISTENCIA F'C= 350 KG/CM2, INCLUYE ENCOFRADO M3 766.80 12,570.24 9,638,860.03 766.80 9,638,860.03 2B.0 CONCRETO EN BORDILLO PARA FUNDICIÓN DE DEFENSAS MARINAS CON RESISTENCIA F'C= 350 KG/CM2, INCLUYE ENCOFRADO M3 40.95 13,033.79 533,733.70 40.95 533,733.70 Total CONCRETO 10,172,593.73 10,172,593.73 2C ACERO DE REFUERZO 2C.0 ACERO DE REFUERZO GRADO 40 (FY = 2,800 KG/CM2) EN MACIZO O CABEZAL KG 35,167.50 63.45 2,231,377.88 35,167.50 2,231,377.88 2C.0 ACERO DE REFUERZO GRADO 40 (FY = 2,800 KG/CM2) EN BORDILLO PARA FIJACIÓN DE DEFENSAS MARINAS KG 3,518.00 63.45 223,217.10 3,518.00 223,217.10 Total ACERO DE REFUERZO 2,454,594.98 2,454,594.98 2D SOLDADURAS DE ARCO 2D.0 SOLDADURAS TIPO A TOPE (7018 X 1/8") EN REFUERZO LONGITUDINAL DE PILOTES UNIDA D 13,958.98 142.68 1,991,667.27 0 0 Total SOLDADURAS DE ARCO 1,991,667.27 0 2E MISCELANEOS 2E.0 SUMINISTRO E INSTALACIÓN DEFENSA MARINA UNIDA D 6.00 1,319,445.3 7,916,671.80 6.00 7,916,671.80 2E.0 SUMINISTRO E INSTALACIÓN BOLARDOS DE AMARRE CON CAPACIDAD DE 150.0 TONS UNIDA D 3.00 148,234.63 444,703.89 3.00 444,703.89 2E.0 SUMINISTRO E INSTALACIÓN ESCALERAS DE ACCESO UNIDA D 3.00 246,029.31 738,087.93 3.00 738,087.93 2E.0 PINTURA AMARILLA TRÁFICO REFLECTIVA CON FRANJAS INCLINADAS COLOR NEGRO EN LA CARA FRONTAL DEL DOLPHIN M2 220.00 1,940.91 427,000.20 220.00 427,000.20 Total MISCELANEOS 9,526,463.82 9,526,463.82 Total DOLPHIN'S DE ATRAQUE 176,863,839.21 68,336,656.67 3.00 DOLPHIN DE AMARRE ESTE - 3A PILOTES 3A.0 FABRICACIÓN DE PILOTE DE CONCRETO REFORZADO DE 50CMX50CM L=46.50M M 1,860.00 6,640.83 12,351,943.80 0 0 3A.0 HINCADO EFECTIVO (30.00M) M 1,200.00 4,234.76 5,081,712.00 1,200.00 5,081,712.00 3A.0 DESCABEZADO DE PILOTES UNIDA D 40.00 5,551.34 222,053.60 40.00 222,053.60 3A.0 PRUEBA DE CARGA DINÁMICAS UNIDA D 1.00 146,008.61 146,008.61 1.00 146,008.61 -40- Total PILOTES 17,801,718.01 5,449,774.21 3B CONCRETO 3B.0 CONCRETO EN MACIZO O CABEZAL M3 79.50 13,145.20 1,045,043.40 79.50 1,045,043.40 Total CONCRETO 1,045,043.40 1,045,043.40 3C ACERO DE REFUERZO 3C.0 ACERO DE REFUERZO CABEZAL KG 4,206.99 63.45 266,933.52 4,206.99 266,933.52 Total ACERO DE REFUERZO 266,933.52 266,933.52 3D SOLDADURAS DE ARCO 3D.0 SOLDADURAS TIPO A TOPE (7018 X 1/8") EN REFUERZO LONGITUDINAL DE PILOTES UNIDA D 1,590.00 142.68 226,861.20 0 0 Total SOLDADURAS DE ARCO 226,861.20 0 3E MISCELANEOS 3E.0 SUMINISTRO E INSTALACIÓN BOLARDOS DE AMARRE CON CAPACIDAD DE 200 TONS UNIDA D 1.00 207,477.39 207,477.39 1.00 207,477.39 3E.0 SUMINISTRO E INSTALACIÓN ESCALERAS DE ACCESO UNIDA D 1.00 246,029.31 246,029.31 1.00 246,029.31 Total MISCELANEOS 453,506.70 453,506.70 TOTAL DOLPHIN DE AMARRE ESTE 19,794,062.83 7,215257.83 4.00 DOLPHIN DE AMARRE OESTE 4A PILOTES 4A.0 FABRICACIÓN DE PILOTE DE CONCRETO REFORZADO DE 50CMX50CM L=46.50M M 1,069.50 6,640.83 7,102,367.69 0 0 4A.0 HINCADO EFECTIVO (30.00 M) M 690.00 4,234.76 2,921,984.40 690.00 2,921,984.40 4A.0 DESCABEZADO DE PILOTES UNIDA D 23.00 5,551.34 127,680.82 23.00 127,680.82 4A.0 PRUEBA DE CARGA DINÁMICAS UNIDA D 1.00 146,008.61 146,008.61 1.00 146,008.61 Total PILOTES 10,298,041.52 3,195,673.83 4B CONCRETO 4B.0 CONCRETO EN MACIZO O CABEZAL M3 60.00 13,325.23 799,513.80 60.00 799,513.80 Total CONCRETO 799,513.80 0.00 4C ACERO DE REFUERZO 4C.0 ACERO DE REFUERZO CABEZAL KG 3,666.40 63.45 232,633.08 3,666.40 232,633.08 Total ACERO DE REFUERZO 232,633.08 0.00 4D SOLDADURAS DE ARCO 4D.0 SOLDADURAS TIPO A TOPE (7018 X 1/8") EN REFUERZO LONGITUDINAL DE PILOTES UNIDA D 840.00 142.68 119,851.20 0 0 Total SOLDADURAS DE ARCO 119,851.20 0 -41- 4E MISCELANEOS 4E.0 SUMINISTRO E INSTALACIÓN BOLARDOS DE AMARRE CON CAPACIDAD DE 200 TONS UNIDA D 1.00 207,477.39 207,477.39 1.00 207,477.39 4E.0 SUMINISTRO E INSTALACIÓN ESCALERAS DE ACCESO UNIDA D 1.00 246,029.31 246,029.31 1.00 246,029.31 Total MISCELANEOS 453,506.70 453,506.70 TOTAL DOLPHIN DE AMARRE OESTE 11,903,546.30 4,681,327.41 5.00 PUENTE DE ACCESO 5A SUB ESTRUCTURA (PILASTRAS) 5A1 PILOTES 5A1. FABRICACIÓN DE PILOTE DE CONCRETO REFORZADO DE 50CMX50CM L=46.50M M 706.00 6,751.91 4,766,848.46 0 0 5A1. HINCADO EFECTIVO (30.00 M) M 246,029.3 4,234.76 2,540,856.00 246,029.3 2,540,856.00 5A1. DESCABEZADO DE PILOTES UNIDA D 20.00 5,551.34 111,026.80 20.00 111,026.80 5A1. PRUEBA DE CARGA DINÁMICAS UNIDA D 1.00 146,008.61 146,008.61 1.00 146,008.61 Total PILOTES 7,564,739.87 2,797,891.41 5A2 PILASTRA 5A2. VIGAS CABEZAL DE CONCRETO REFORZADO 0.80 X 0.80 X 7.40 MTS CONCRETO DE F'C = 280 KG/CM2 Y ACERO (FY = 4,200 KG/CM2) M 37.00 16,316.53 603,711.61 37.00 603,711.61 5A2. PLACAS DE NEOPRENO GRADO 70 DUREZA 63.8 KG/CM2 MEDIDAS 40 X 50 X 1.6 CM UNIDA D 32.00 9,618.14 307,780.48 32.00 307,780.48 Total PILASTRA 911,492.09 911,492.09 Total SUB ESTRUCTURAS (PILASTRAS) 8,476,231.96 3,709,383.50 5B SUPER ESTRUCTURA 5B1 VIGAS 5B1. VIGAS PREFABRICADAS DE CONCRETO REFORZADO M 226.12 25,655.10 5,801,131.21 226.12 5,801,131.21 5B1. DIAFRAGMAS DE CONCRETO REFORZADO M 43.20 5,365.10 231,772.32 43.20 231,772.32 Total VIGAS 6,032,903.53 6,032,903.53 5B2 LOSA DE CONCRETO REFORZADO 5B2. CONCRETO (F'C= 280 KG/CM2) INCLUYE CIMBRA M3 112.00 16,771.93 1,878,456.16 112.00 1,878,456.16 5B2. ACERO FY= 4200 KG/CM2 KG 12,791.81 63.45 811,640.34 12,791.81 811,640.34 Total LOSA DE CONCRETO REFORZADO 2,690,096.50 2,690,096.50 5B3 BORDILLO 5B3. BORDILLO LATERAL DE 0.30 X 0.30 M. CONCRETO (F'C= 280 KG/CM2) Y ACERO M 113.70 1,743.65 198,253.01 113.70 198,253.01 -42- (FY = 2,800 KG/CM2) Total BORDILLO 198,253.01 198,253.01 Total SUPER ESTRUCTURA 8,921,253.04 8,921,253.04 5C ESTRUCTURA SOPORTERÍA TUBERÍAS 5C.0 SOPORTES VERTICALES W6X20 M 69.00 6,541.01 451,329.69 69.00 451,329.69 5C.0 SOPORTES HORIZONTALES TUBO HSS 6''X6''X1/4". M 460.52 3,484.52 1,604,691.15 460.52 1,604,691.15 Total ESTRUCTURA SOPORTERÍA TUBERÍAS 2,056,020.84 2,056,020.84 Total PUENTE DE ACCESO 19,453,505.84 14,686,657.38 6.00 OBRA TERRESTRE 6A CALLE DE ACCESO 6A.0 PREPARACIÓN DE SUBRASANTE (CONFORMACIÓN, NIVELACIÓN Y COMPACTACIÓN AL 95%) M2. 768.00 42.32 32,501.76 768.00 32,501.76 6A.0 DEMOLICIÓN DE CERCO EXISTENTE M. 33.50 2,053.52 68,792.92 33.50 68,792.92 6A.0 MUROS LATERALES DE CONTENCIÓN PARA RELLENO DE CALLE DE ACCESO DE CONCRETO REFORZADO DE ESTACIONES: 0+170 A 0+237.40 M. 134.80 36,043.42 4,858,653.02 134.80 4,858,653.02 6A.0 SUMINISTRO, COLOCACIÓN Y COMPACTACIÓN AL 100% DE LA SUBBASE DE 30.0 CM DE ESPESOR CONFORME A ESPECIFICACIONES M3. 581.66 1,391.11 809,153.04 581.66 809,153.04 6A.0 RELLENO CON MATERIAL SELECTO COMPACTADO AL 100% DE ESTACIONES: 0+110 A 0+237.40 M3. 663.85 548.52 364,135.00 663.85 364,135.00 6A.0 PAVIMENTO DE CONCRETO HIDRÁULICO DE 25.0 CM DE ESPESOR M2. 1,735.00 1,861.37 3,229,476.95 1,735.00 3,229,476.95 6A.0 BORDILLO DE CONCRETO F'C= 210 KG/CM2 ANCLADO AL PAVIMENTO CON BARRAS NO.4 @ 0.30 M C.A.C. M. 444.68 449.57 199,914.79 444.68 199,914.79 6A.0 ACERAS LATERALES DE CONCRETO F'C= 210 KG/CM2 DE 1.00 M. DE ANCHO Y ESPESOR DE 0.10 M. INCLUYE RELLENO DE MATERIAL SELECTO DE 0.30 M DE ESPESOR, M2. 889.36 1,136.01 1,010,321.85 889.36 1,010,321.85 6A.0 PINTURA AMARILLA REFLECTIVA HIGH - STANDARD EN LÍNEA CENTRAL DE CALLE Y BORDILLOS LATERALES M. 667.02 129.08 86,098.94 667.02 86,098.94 Total CALLE DE ACCESO 10,659,048.27 10,659,048.27 6B ESTACIONAMIENTO 6B.0 PREPARACIÓN DE LA SUBRASANTE (CONFORMACIÓN, NIVELACIÓN Y COMPACTACIÓN AL 95%) M2 894.05 42.32 37,836.20 894.05 37,836.20 -43- 6B.0 SUMINISTRO, COLOCACIÓN Y COMPACTACIÓN AL 100% DE LA SUB- BASE DE 30.0 CM DE ESPESOR, CONFORME A ESPECIFICACIONES M3 268.22 1,270.41 340,749.37 268.22 340,749.37 6B.0 PAVIMENTO DE CONCRETO HIDRÁULICO DE 25 CM DE ESPESOR M2 894.05 1,861.37 1,664,157.85 894.05 1,664,157.85 6B.0 BORDILLO DE CONCRETO F'C= 210 KG/CM2. ANCLADO AL PAVIMENTO CON BARRAS NO.4 @ 0.30 M. C.A.C. CONFORME ESPECIFICACIONES Y DISEÑO. M 133.10 449.57 59,837.77 133.10 59,837.77 6B.0 ACERAS LATERALES DE CONCRETO F'C= 210 KG/CM2 DE 1.00 M DE ANCHO Y ESPESOR 0.10 M. INCLUYE RELLENO DE MATERIAL SELECTO DE 0.30 M DE ESPESOR, CONFORME A ESPECIFICACIONES Y DISEÑO. M2 133.10 1,136.01 151,202.93 133.10 151,202.93 6B.0 PINTURA AMARILLA REFLECTIVA HIGH - STANDARD EN LÍNEA CENTRAL DE CALLE Y BORDILLOS LATERALES M 188.10 129.08 24,279.95 188.10 24,279.95 Total ESTACIONAMIENTO 2,278,064.07 2,278,064.07 6C ALCANTARILLADO PLUVIAL 6C.0 EXCAVACIÓN DE ZANJAS M3 17.00 326.77 5,555.09 17.00 5,555.09 6C.0 CUNA DE TUBERÍA DE ARENA DE RÍO TAMIZADA M3 2.40 1,266.83 3,040.39 2.40 3,040.39 6C.0 SUMINISTRO E INSTALACIÓN DE TUBERIA P.V.C. - SDR 41 DE 8" DE DIÁMETRO M 40.00 1,003.99 40,159.60 40.00 40,159.60 6C.0 TRAGANTES FORMADOS POR CAJAS DE CONCRETO REFORZADO Y MAMPOSTERÍA CON REJILLA DE HIERRO FUNDIDO UNIDA D 5.00 39,467.07 197,335.35 5.00 197,335.35 6C.0 PRUEBA HIDROSTÁTICA DE TUBERÍAS M 40.00 199.68 7,987.20 40.00 7,987.20 6C.0 CANAL RECOLECTOR DE CONCRETO REFORZADO M 102.00 6,318.73 644,510.46 102.00 644,510.46 Total ALCANTARILLADO PLUVIAL 898,588.09 898,588.09 6D CAJAS PUENTE 6D1 AMPLIACIÓN DE CAJA PUENTE EXISTENTE 6D1. EXCAVACIÓN CIMIENTO. M3 2.66 370.70 986.06 2.66 986.06 6D1. RELLENO CON MATERIAL SELECTO COMPACTADO AL 100% DE 0.30 M. DE ESPESOR, DIMENSIONES: 2.30 X 3.85 X 0.30 M. M3 2.66 473.08 1,258.39 2.66 1,258.39 6D1. CAPA DE TRABAJO CON CONCRETO POBRE F'C= 150 KG/CM2 DE 5.0 CENTIMETROS DE ESPESOR, DIMENSIONES: 2.30 X 3.85 X 0.05 M. M2 8.86 550.52 4,877.61 8.86 4,877.61 -44- 6D1. CONCRETO REFORZADO EN ZAPATA F'C= 282 KG/CM2., ACERO FY=2,800 KG/CM2., INCLUYE CIMBRA, DIMENSIONES: 2.20 X 3.85 X 0.35 M. M 3.85 17,514.05 67,429.09 3.85 67,429.09 6D1. CONCRETO REFORZADO EN MUROS F'C= 282 KG/CM2., ACERO FY=2,800 KG/CM2., INCLUYE CIMBRA, DIMENSIONES: 1.00 X 3.75 X 0.30 M. (2) M 7.50 8,758.71 65,690.33 7.50 65,690.33 6D1. CONCRETO REFORZADO EN LOSA DE CUBIERTA F'C= 280 KG/CM2., ACERO FY=2,800 KG/CM2., INCLUYE CIMBRA, DIMENSIONES: 1.60 X 3.75 X 0.33 M. M 3.75 17,866.87 67,000.76 3.75 67,000.76 Total AMPLIACIÓN DE CAJA PUENTE EXISTENTE 207,242.24 207,242.24 6D2 CAJA PUENTE PARA PASO DE TUBERIAS 6D2. EXCAVACIÓN CIMIENTO. M3 20.55 370.70 7,617.89 20.55 7,617.89 6D2. RELLENO CON MATERIAL SELECTO COMPACTADO AL 100% DE 0.30 M. DE ESPESOR, DIMENSIONES: 2.60 X 9.3 X 0.30 M. M3 7.25 473.08 3,429.83 7.25 3,429.83 6D2. CAPA DE TRABAJO CON CONCRETO POBRE F'C= 150 KG/CM2 DE 5.0 CENTIMETROS DE ESPESOR, DIMENSIONES: 2.60 X 9.3 X 0.05 M. M2 24.18 550.52 13,311.57 24.18 13,311.57 6D2. CONCRETO REFORZADO EN ZAPATA F'C= 282 KG/CM2., ACERO FY=2,800 KG/CM2., INCLUYE CIMBRA, DIMENSIONES: 2.60 X 9.3 X 0.35 M. M 9.30 17,514.05 162,880.67 9.30 162,880.67 6D2. CONCRETO REFORZADO EN MUROS F'C= 282 KG/CM2., ACERO FY=2,800 KG/CM2., INCLUYE CIMBRA, DIMENSIONES: 1.20 X 9.3 X 0.30 M. (2) M 18.60 8,758.56 162,909.22 18.60 162,909.22 6D2. CONCRETO REFORZADO EN LOSA DE CUBIERTA F'C= 280 KG/CM2., ACERO FY=2,800 KG/CM2., INCLUYE CIMBRA, DIMENSIONES: 1.80 X 9.30 X 0.30 M. M 9.30 17,866.87 166,161.89 9.30 166,161.89 Total CAJA PUENTE PARA PASO DE TUBERIAS 516,311.07 516,311.07 Total CAJAS PUENTE 723,553.31 723,553.31 6E PROTECCIÓN COSTERA 6E.0 PROTECCIÓN COSTERA CON PEDRAPLEN (RIP - RAP), FORMADO POR DOS CAPAS DE CUBOS DE CONCRETO DE 200 KGS DE PESO CADA UNO COLOCADOS AL AZAR Y DOS CAPAS FILTRANTES DE MATERIAL GRANULAR DE ACUERDO A LAS ESPECIFICACIONES GRANULOMÉTRICAS. EL PEDRAPLÉN INICIARÁ SU DESARROLLO A UNA PROFUNDIDAD DE -2.00 M CONFORME AL DISEÑO Y PLANOS DE LA PROTECCIÓN COSTERA M2 2,300.00 9,869.18 22,699,114.00 2,300.00 22,699,114.00 Total PROTECCIÓN COSTERA 22,699,114.00 22,699,114.00 6F CERCO PERIMETRAL 6F.0 ZAPATA CORRIDA DE CONCRETO REFORZADO DE 0.45 X 0.25, REFUERZO TRANSVERSAL #4 @ 0.20 M. Y M 254.50 6,088.85 1,549,612.33 254.50 1,549,612.33 -45- LONGITUDINAL 5 # 2, F'C = 210 KG/CM2 Y FY = 2,800 KGS/CM2; SOBRE ELEVACIÓN DE BLOQUE CISADO DE 0.15 X 0.20 X 0.40 M. PEDESTALES DE CONCRETO REFORZADO DE 0.20 X 0.20 X 1.25 M. DE ALTURA TALLADOS, SOLERA INFERIOR DE 0.15 X 0.10 M. REFORZADA CON 2 # 3 Y ALACRANES # 2 @ 0.15 M. TALLADA; POSTES TUBO H.G. DE 2", MALLA CICLÓN PLASTIFICADA COLOR VERDE DE 6' Y ALAMBRE DE PÚAS EN PARTE SUPERIOR Total CERCO PERIMETRAL 1,549,612.33 1,549,612.33 6G PORTONES 6G.0 PORTÓN PRINCIPAL DE DOS HOJAS FABRICADO CON TUBO H.G. DE 2", FORRADO CON MALLA CICLÓN PLASTIFICADA COLOR VERDE, CON CERRADURA PORTA CANDADO, ALTURA DE 1.80 M. Y ANCHO DE 3.65 M. POR HOJA, PINTADO CON ANTICORROSIVO MARINO, INCLUYE DOS COLUMNAS DE CONCRETO REFORZADO DE 0.45 X 0.45 M. PARA GUINDAR LOS PORTONES UNIDA D 1.00 70,057.61 70,057.61 1.00 70,057.61 6G.0 PORTÓN SECUNDARIO PARA BOTADO DE LANCHA PARA CONTROL DE DERRAMES. UNA HOJA DE 2.30 M DE ANCHO POR 1.80 M DE ALTO, FABRICADO CON TUBO H.G. DE 2", FORRADO CON MALLA CICLÓN PLASTIFICADA COLOR VERDE, CON CERRADURA PORTA CANDADO, PINTADO CON ANTICORROSIVO MARINO, INCLUYE DOS COLUMNAS DE CONCRETO REFORZADO DE 0.30 X 0.30 M PARA GUINDAR LOS PORTONES. (EL CALIBRE DE LA MALLA DEBE SER NO 10.) UNIDA D 1.00 28,597.36 28,597.36 1.00 28,597.36 Total PORTONES 98,654.97 98,654.97 6H RAMPA PARA BOTADURA DE LANCHA 6H.0 RAMPA PARA BOTADURA DE LANCHA DE CONCRETO CICLÓPEO. DIMESIONES: 2.50 X 10.50 X 0.20 M. M2 26.25 2,269.71 59,579.89 26.25 59,579.89 Total RAMPA PARA BOTADURA DE LANCHA 59,579.89 59,579.89 6I CASETA DE CONTROL 6I.01 CASETA DE CONTROL DE LA UPP EN ACCESO A LA TERMINAL DE GRANELES LÍQUIDOS GLOBA L 1.00 1,054,312.4 1,054,312.49 1.00 1,054,312.49 Total CASETA DE CONTROL 1,054,312.49 1,054,312.49 6J RED DE AGUA POTABLE 6J.0 TUBERIA H.G. 4", INCLUYE ZANJO, ATERRADO, SISTEMA DE SUSPENSIÓN EN PUENTE DE ACCESO. M 276.00 2,829.77 781,016.52 276.00 781,016.52 6J.0 TUBERÍA H.G. 3", INCLUYE: SISTEMA DE SUSPENSIÓN EN PUENTE DE ACCESO Y PLATAFORMA DE OPERACIONES. M 74.00 2,452.41 181,478.34 74.00 181,478.34 6J.0 CAJA DE REGISTRO TOMA DE AGUA, INCLUYE ACCESORIOS UNIDA D 3.00 20,645.34 61,936.02 3.00 61,936.02 6J.0 VÁLVULAS DE CONTROL Y ACCESORIOS GLOBA 1.00 141,263.46 141,263.46 1.00 141,263.46 -46- 4 L 6J.0 HIDRANTES, INCLUYE ACCESORIOS UNIDA D 2.00 79,854.95 159,709.90 2.00 159,709.90 Total RED DE AGUA POTABLE 1,325,404.24 1,325,404.24 Total OBRA TERRESTRE 41,345,931.66 41,345,931.66 7.00 TORRE 7A COMPONENTE CIVIL 7A.0 MARCAJE Y TRAZADO DE ÁREA GLOBA L 1.00 35,164.96 35,164.96 1.00 35,164.96 7A.0 CIMENTACIONES DE 1.40 X 1.40 X 2.10 MTS. CON ACERO ARMADO PARA FIJACIÓN DE POSTES METÁLICOS DE H= 22.86 MTS CON PERNOS. 6 PERNOS DE FIJACIÓN NC 3/4" ESTILO REDONDO CON CONCRETO 4500 LBS/PLG2. UNIDA D 2.00 93,065.81 186,131.62 2.00 186,131.62 7A.0 EXCAVACIÓN DE MATERIAL DE ARENA PARA OBTENER PROFUNDIDAD DESEADA M3 156.00 370.70 57,829.20 156.00 57,829.20 7A.0 CAJAS DE REGISTRO SUBTERRÁNEAS DE 0.6 X 0.6 X 0.6 MTS. PARA INSTALACIONES ELÉCTRICAS. UNIDA D 4.00 15,833.84 63,335.36 4.00 63,335.36 7A.0 BURRA DE MADERA CON MUFA DE ENTRADA DE CABLES, PARA LA FIJACIÓN DEL TRANSFORMADOR DE 300 KVA. UNIDA D 1.00 85,912.97 85,912.97 1.00 85,912.97 7A.0 SUMINISTRO E INSTALACIÓN DE TUBERÍA DIA.1 1/2" PVC GRADO 40 EMBEBIDA EN CONCRETO EN MANGA IZQUIERDA DEL MUELLE. M 66.00 565.20 37,303.20 66.00 37,303.20 7A.0 SUMINISTRO E INSTALACIÓN DE TUBERÍA DIA.4" PVC GRADO 40 EN ZANJA DE 0.6 MTS DE PROFUNDIDAD. M 180.00 1,306.62 235,191.60 180.00 235,191.60 7A.0 SUMINISTRO E INSTALACIÓN DE POSTES GALVANIZADOS EN CALIENTE DE 22.86 METROS DE ALTURA CON LA CANASTA PARA EL MONTAJE DE LUMINARIAS, INCLUYENDO LA ESCALERILLA TIPO PERNO. UNIDA D 2.00 1,539,084.9 3,078,169.94 2.00 3,078,169.94 7A.0 CONSTRUCCIÓN DE CAJAS DE REGISTRO CON MEDIDA DE 0.60*0.60*0.60* (MANHOLES TIPO 8) UNIDA D 6.00 21,058.17 126,349.02 6.00 126,349.02 Total COMPONENTE CIVIL 3,905,387.87 3,905,387.87 7B COMPONENTE ELÉCTRICO 7B.0 SUMINISTRO E INSTALACIÓN DE LINEA PRIMARIA 3 FASE, 4 HILOS, 13.8 KV ESTRUCTURAS TIPO URBANA INCLUIDAS LAS CAJAS CORTACIRCUITOS ROMPE ARCO DE 200A. 13.8 KV M 80.00 13,814.16 1,105,132.80 80.00 1,105,132.80 7B.0 SUMINISTRO E INSTALACIÓN DE POSTES DE CONCRETO Y RETENIDAS. UNIDA D 3.00 334,930.82 1,004,792.46 3.00 1,004,792.46 7B.0 SUMINISTRO E INSTALACIÓN DE TRANSFORMADOR DE 100 KVA., PRIMARIO 13.8 KV ESTRELLA, UNIDA D 3.00 275,695.61 827,086.83 3.00 827,086.83 -47- SECUNDARIO 208/102 V 7B.0 SUMINISTRO E INSTALACIÓN DE LUMINARIAS LED DE 200 W IP 66, COLOR DE LUZ BLANCO FRÍO, CON RECUBRIMIENTO DE PINTURA QUE SOPORTE EL AMBIENTE MARINO . UNIDA D 2.00 6,428.04 12,856.08 2.00 12,856.08 7B.0 SUMINISTRO E INSTALACIÓN DE LUMINARIAS LED TIPO ESTADIO DE 1000 W, IP 66, COLOR DE LUZ BLANCO FRÍO, CON RECUBRIMIENTO DE PINTURA QUE SOPORTE EL AMBIENTE MARINO . UNIDA D 24.00 15,970.63 383,295.12 24.00 383,295.12 7B.0 SUMINISTRO E INSTALACIÓN DE 2 CIRCUITOS 3 PH, 4W 1X1/10 RHW POR FASE + 1X2 THW NEUTRO M 140.00 2,475.21 346,529.40 140.00 346,529.40 7B.0 SUMINISTRO E INSTALACIÓN DE 1 CIRCUITOS 3 PH, 4W 1X2 RHW POR FASE + 1X6 THW NEUTRO M 40.00 1,869.56 74,782.40 40.00 74,782.40 7B.0 SUMINISTRO E INSTALACIÓN DE 1 CIRCUITOS 3 PH, 4W 1X2 RHW POR FASE + 1X6 THW NEUTRO DESDE MANHOLE AL PIE DE LA TORRE HASTA LA CAJA DE CONEXIÓN EN LA CANASTA M 60.00 1,869.56 112,173.60 60.00 112,173.60 7B.0 SUMINISTRO E INSTALACIÓN DE CABLE TSJ 3X10 PARA ALIMENTACIÓN DE LUMINARIAS 1000 W MH, DESDE CAJA DE CONEXIÓN DE BORNERAS E INSTALADA EN LA PARTE SUPERIOR DE LA CANASTA EN LA TORRE M 100.00 582.29 58,229.00 100.00 58,229.00 7B.1 SUMINISTRO E INSTALACIÓN DE 2 CIRCUITO DE FUERZA, 1 AL INICIO DEL MUELLE Y EL OTRO AL FINAL PARA INSTALACIÓN DE BOMBAS, HERRAMIENTAS ELÉCTRICAS, ETC. BAJO NORMA LOCALIZACIÓN PELIGROSA (NFPA 50A, 51, 52, 58, 59) (CLASE I, II, Y III, DIVISIÓN 1 Y 2) DEL NEC. GLOBA L 1.00 174,081.40 174,081.40 1.00 174,081.40 7B.1 SUMINISTRO E INSTALACIÓN DE LUCES DE OSBTRUCCIÓN CON CONTROL 120 V, 1PH UNIDA D 2.00 53,575.34 107,150.68 2.00 107,150.68 7B.1 SUMINISTRO E INSTALACIÓN DE PARARAYOS TIPO FRANKLIN PUNTA DE PLATA UNIDA D 2.00 119,369.77 238,739.54 2.00 238,739.54 7B.1 SUMINISTRO E INSTALACIÓN DE VARILLAS POLO A TIERRA COBRIZADAS DE 5/8"X8' UNIONES EXOTÉRMICAS UNIDA D 12.00 7,508.21 90,098.52 12.00 90,098.52 7B.1 SUMINISTRO E INSTALACIÓN DE CABLE DESNUDO 2/0 PARA ATERRIZAR LOS PARARAYOS M 100.00 1,038.94 103,894.00 100.00 103,894.00 7B.1 SUMINISTRO E INSTALACIÓN DE TABLERO DE DISTRIBUCIÓN EN UNID. CAJA MOLDEADA MEMA 3R, 400 A, 208/120 V. DOS CIRCUITOS DE 60A 3PH, 1 CIRCUITO DE 80 A 3PH UNIDA D 1.00 433,638.82 433,638.82 1.00 433,638.82 -48- 7B.1 SUMINISTRO E INSTALACIÓN DE TRANSFORMADOR SECO 480 V DELTA, 208/120 V ESTRELLA, 30 KVA, SERVICIO AUXILIAR. UNIDA D 1.00 106,019.05 106,019.05 1.00 106,019.05 7B.1 BOMBA CONTRA INCENDIO TIPO TURBINA ACCIONADA CON MOTOR ELÉCTRICO 480 V, 3 FASES UNIDA D 1.00 9,571,907.3 9,571,907.34 1.00 9,571,907.34 Total COMPONENTE ELÉCTRICO 14,750,407.04 14,750,407.04 Total TORRE 18,655,794.91 18,655,794.91 8.00 OBRAS GENERALES 8.01 RESCATE DE DEFENSAS SHIBATA CSS- 1150-H UNIDA D 4.00 25,413.92 101,655.68 4.00 101,655.68 8.02 RESCATE DE BOLARDO DE 70 TONELADAS UNIDA D 3.00 18,155.58 54,466.74 3.00 54,466.74 8.03 DEMOLICIÓN Y RETIRO DE ESCOMBROS DE CABEZAL DE SUPERESTRUCTURA M3 195.00 46,221.40 9,013,173.00 195.00 9,013,173.00 8.04 EXTRACCIÓN Y RETIRO DE PILOTES DE DOLPHINS UNIDA D 123.00 215,348.77 26,487,898.71 123.00 26,487,898.71 8.05 DEMOLICIÓN Y RETIRO DE ESCOMBROS DE LOSA DE PUENTE DE ACCESO M3 151.20 46,221.40 6,988,675.68 151.20 6,988,675.68 8.06 DEMOLICIÓN Y RETIRO DE ESCOMBROS DE LOSA DE BANCADA DE PILOTES UNIDA D 11.00 307,323.07 3,380,553.77 11.00 3,380,553.77 8.07 EXTRACCIÓN Y RETIRO DE PILOTES DE PUENTE DE ACCESO UNIDA D 33.00 215,348.77 7,106,509.41 33.00 7,106,509.41 8.08 ADMINISTRACION DELEGADA GLOBA L 1.00 10,000,000. 10,000,000.00 1.00 10,000,000.00 Total OBRAS GENERALES 63,132,932.99 63,132,932.99 9.0 NUEVAS OBRAS 9.01 FABRICACIÓN DE PILOTES DE CONCRETO PRETENSADO DE 45CMX45CMS M 0 6,763.64 0 19,678 133,094,907.92 Total Nuevas Obras 133,094,907.92 TOTAL DEL PROYECTO 387,550,565.92 387,550,418.95